Each full power and Class A TV station being repacked must file its next Transition Progress Report with the FCC by January 10, 2019.  The Report must detail the progress a station has made in constructing facilities on its newly-assigned channel and in terminating operations on its current channel during the months of October, November, and December 2018.

Following the 2017 broadcast television spectrum incentive auction, the FCC imposed a requirement that television stations transitioning to a new channel in the repack file a quarterly Transition Progress Report by the 10th of January, April, July, and October of each year.  The first such report was due on October 10, 2017.

The next quarterly Transition Progress Report must be filed with the FCC by January 10, 2019, and must reflect the progress made by the reporting station in constructing facilities on its newly-assigned channel and in terminating operations on its current channel during the period from October 1 through December 31, 2018.  The Report must be filed electronically on FCC Form 2100, Schedule 387 via the FCC’s Licensing and Management System (LMS), accessible at https://enterpriseefiling.fcc.gov/dataentry/login.html.

The Transition Progress Report form includes a number of baseline questions, such as whether a station needs to conduct a structural analysis of its tower, obtain any non-FCC permits or FAA Determinations of No Hazard, or order specific types of equipment to complete the transition.  Depending on a station’s response to a question, the electronic form then asks for additional information regarding the steps the station has taken towards completing the required item.  Ultimately, the form requires each station to indicate whether it anticipates that it will meet the construction deadline for its transition phase. Continue reading →

Published on:

The next Quarterly Issues/Programs List (“Quarterly List”) must be placed in stations’ public inspection files by January 10, 2019, reflecting information for the months of October, November, and December 2018.

Content of the Quarterly List

The FCC requires each broadcast station to air a reasonable amount of programming responsive to significant community needs, issues, and problems as determined by the station.  The FCC gives each station the discretion to determine which issues facing the community served by the station are the most significant and how best to respond to them in the station’s overall programming.

To demonstrate a station’s compliance with this public interest obligation, the FCC requires the station to maintain and place in the public inspection file a Quarterly List reflecting the “station’s most significant programming treatment of community issues during the preceding three month period.”  By its use of the term “most significant,” the FCC has noted that stations are not required to list all responsive programming, but only that programming which provided the most significant treatment of the issues identified.

Given that program logs are no longer mandated by the FCC, the Quarterly Lists may be the most important evidence of a station’s compliance with its public service obligations.  The lists also provide important support for the certification of Class A television station compliance discussed below.  We therefore urge stations not to “skimp” on the Quarterly Lists, and to err on the side of over-inclusiveness.  Otherwise, stations risk a determination by the FCC that they did not adequately serve the public interest during the license term.  Stations should include in the Quarterly Lists as much issue-responsive programming as they feel is necessary to demonstrate fully their responsiveness to community needs.  Taking extra time now to provide a thorough Quarterly List will help reduce risk at license renewal time.

It should be noted that the FCC has repeatedly emphasized the importance of the Quarterly Lists and often brings enforcement actions against stations that do not have fully complete Quarterly Lists or that do not timely place such lists in their public inspection file.  The FCC’s base fine for missing Quarterly Lists is $10,000.

Preparation of the Quarterly List

The Quarterly Lists are required to be placed in the public inspection file by January 10, April 10, July 10, and October 10 of each year.  The next Quarterly List is required to be placed in stations’ public inspection files by January 10, 2019, covering the period from October 1, 2018 through December 31, 2018.

Stations should keep the following in mind:

  • Stations should maintain routine outreach to the community to learn of various groups’ perceptions of community issues, problems, and needs.  Stations should document the contacts they make and the information they learn.  Letters to the station regarding community issues should be made a part of the station’s database.
  • There should be procedures in place to organize the information that is gathered and bring it to the attention of programming staff with a view towards producing and airing programming that is responsive to significant community issues.  This procedure and its results should be documented.
  • Stations should ensure that there is some correlation between the station’s contacts with the community, including letters received from the public, and the issues they have identified in their Quarterly Lists.  A station should not overlook significant issues.  In a contested license renewal proceeding, while the station may consider what other stations in the market are doing, each station will have the burden of persuading the FCC that it acted “reasonably” in deciding which issues to address and how.
  • Stations should not specify an issue for which no programming is identified.  Conversely, stations should not list programs for which no issue is specified.
  • Under its former rules in this area, the FCC required a station to list five to ten issues per Quarterly List.  While that specific rule has been eliminated, the FCC has noted that such an amount will likely demonstrate compliance with the station’s issue-responsive programming obligations.  However, the FCC has noted that some licensees may choose to concentrate on fewer than five issues if they cover them in considerable depth.  Conversely, the FCC has noted that other broadcasters may address more than ten issues in a given quarter, due perhaps to program length, format, etc.
  • The Quarterly Lists should reflect a wide variety of significant issues.  For example, five issues affecting the Washington, DC community might be: (1) the fight over statehood for the District of Columbia; (2) fire code violations in DC school buildings; (3) clean-up of the Anacostia River; (4) reforms in the DC Police Department; and (5) proposals to increase the use of traffic cameras on local streets.  The issues should change over time, reflecting the station’s ongoing ascertainment of changing community needs and concerns.
  • Accurate and complete records of which programs were used to discuss or treat which issues should be preserved so that the job of constructing the Quarterly List is made easier.  The data retained should help the station identify the programs that represented the “most significant treatment” of issues, e.g., duration, depth of presentation, frequency of broadcast, etc.
  • The listing of “most significant programming treatment” should demonstrate a wide variety in terms of format, duration (long-form and short-form programming), source (locally produced is presumptively the best), time of day (times of day when the programming is likely to be effective), and days of the week.  Stations should not overlook syndicated and network programming as ways to address issues.
  • Stations should prepare each Quarterly List in time for it to be placed in their public inspection file on or before the due date.  If the deadline is not met, stations should give the true date when the document was placed in the public inspection file and explain its lateness.
  • Stations should show that their programming commitment covers all three months within each quarter.

Continue reading →

Published on:

As 2018 moves into the rear view mirror, 2019 promises to be a consequential year for broadcasters.  In accordance with a Pillsbury holiday tradition that goes back farther than any of us can remember, earlier this month we published our annual calendar of upcoming regulatory deadlines for broadcasters–a compendium of the currently “known knowns” of 2019 (this year’s edition being innovatively titled, for the first time ever, the 2019 Broadcasters’ Calendar).  It’s chock-full of dates and deadlines affecting TV and radio in the coming year, and cross-references some of our other Advisories to help stations meet their regulatory obligations in the year ahead.

Of course, 2019 will also bring some currently “known unknowns” into focus, with one of the biggest being the FCC’s recently-launched 2018 Quadrennial Review of its media ownership rules–a proceeding that could well alter the broadcast landscape when it reaches completion.

But as broadcasters look ahead to 2019, pondering both the knowns and unknowns of the coming year, they can at least recount with the confidence of hindsight what rule changes 2018 dropped into their regulatory stocking, right?  Perhaps not.  In a year when deregulatory changes were announced at a steady pace, some broadcasters have become confused as to whether a particular rule change was just proposed, voted on, or has actually gone into effect.

So as we prepare for 2019, let’s take a quick refresher on the changes to the FCC’s Rules 2018 brought, and what’s still to come in 2019:

  • Myth: In 2018, the FCC eliminated the requirement that stations file copies of contracts like TV network affiliations, articles of incorporation, bylaws, options, etc. with the FCC.
  • Fact: While the FCC voted in 2018 to eliminate the paper filing of certain contracts, the process for implementing that change has not yet been completed.  As a result, the rule remains in effect, and stations must continue to file such contracts in paper form at the FCC until January 22, 2019.  Also, while paper copies of these contracts need no longer be filed after that date, stations must still either upload them to their online public file or upload a list of such contracts to the online public file and promptly make copies available to those requesting them.  Check out our CommLawCenter article on this topic.
  • Myth: Broadcasters have been relieved of the need to post a copy of their license at their transmission facility.
  • Fact: Not yet! Even though the FCC voted to eliminate the posting requirement in December 2018, the rule change won’t go into effect until after it has been published in the Federal Register.  As a result, this “2018 rule change” also won’t go into effect until sometime in 2019.
  • Myth: Since all stations were required to file their biennial ownership reports in 2018, that means no more biennial ownership reports until 2020, right?
  • Fact: Unfortunately not the case.  The biennial ownership reports filed in 2018 reported station ownership as of October 1, 2017.  That filing deadline was extended from December 1, 2017 to March 2, 2018 due to the merging of the filing deadlines for all commercial and noncommercial stations, as well as delays in bringing the FCC’s new ownership report filing system online.  As a result, the next batch of biennial ownership reports are due December 1, 2019, and must report station ownership as it exists on October 1, 2019.
  • Myth: In 2019, the FCC will reimburse LPTV, TV translator, and FM broadcast stations for all their costs incurred as a result of the TV spectrum repack.
  • Fact: A partial Yes. In March 2018, Congress passed legislation allocating more repack reimbursement funds and expanding the list of entities eligible for reimbursement to include these types of facilities.  However, in its August Notice of Proposed Rulemaking, the FCC noted that Congress had limiting eligibility for LPTV stations to those that were licensed and operating for nine of the twelve months prior to April 13, 2017.  The FCC also proposed reimbursing FM radio stations on a sliding scale based on the length of their time off-air, with only those stations off for more than thirty days entitled to 100% reimbursement.  All in all, certain stations may be on their way to receiving reimbursements, but who will be reimbursed and for how much (and in what order of priority) remains to be determined in 2019.  For more, check out our CommLawCenter article on this topic.
  • Myth: In 2019, CommLawCenter will be the place to go for up-to-date news and analysis in the world of communications law and business.
  • Fact: Actually, this one is true!  Best wishes to all for a New Year that holds few unpleasant regulatory surprises.  Keeping the 2019 Broadcasters’ Calendar close at hand will go a long way in achieving that result.
Published on:

This Pillsbury Broadcast Station Advisory is directed to radio and television stations in the areas noted above, and highlights upcoming deadlines for compliance with the FCC’s EEO Rule.

December 1, 2018 is the deadline for broadcast stations licensed to communities in Alabama, Colorado, Connecticut, Georgia, Maine, Massachusetts, Minnesota, Montana, New Hampshire, North Dakota, Rhode Island, South Dakota, and Vermont to place their Annual EEO Public File Report in their public inspection file and post the report on their station website.  In addition, certain of these stations, as detailed below, must electronically file an EEO Mid-Term Report on FCC Form 397 by December 3 (because December 1 falls on a Saturday this year, the Form 397 filing deadline rolls to the next business day).

Under the FCC’s EEO Rule, all radio and television station employment units (“SEUs”), regardless of staff size, must afford equal opportunity to all qualified persons and practice nondiscrimination in employment.

In addition, those SEUs with five or more full-time employees (“Nonexempt SEUs”) must also comply with the FCC’s three-prong outreach requirements.  Specifically, Nonexempt SEUs must (i) broadly and inclusively disseminate information about every full-time job opening, except in exigent circumstances, (ii) send notifications of full-time job vacancies to referral organizations that have requested such notification, and (iii) earn a certain minimum number of EEO credits, based on participation in various non-vacancy-specific outreach initiatives (“Menu Options”) suggested by the FCC, during each of the two-year segments (four segments total) that comprise a station’s eight-year license term.  These Menu Option initiatives include, for example, sponsoring job fairs, participating in job fairs, and having an internship program.

Nonexempt SEUs must prepare and place their Annual EEO Public File Report in the public inspection files and on the websites of all stations comprising the SEU (if they have a website) by the anniversary date of the filing deadline for that station’s license renewal application.  The Annual EEO Public File Report summarizes the SEU’s EEO activities during the previous 12 months, and the licensee must maintain adequate records to document those activities.  Nonexempt SEUs must submit to the FCC the two most recent Annual EEO Public File Reports when they file their license renewal applications.

In addition, all TV station SEUs with five or more full-time employees and all radio station SEUs with 11 or more full-time employees must submit to the FCC the two most recent Annual EEO Public File Reports at the mid-point of their eight-year license term along with FCC Form 397—the Broadcast Mid-Term EEO Report.

Exempt SEUs—those with fewer than five full-time employees—do not have to prepare or file Annual or Mid-Term EEO Reports.

For a detailed description of the EEO Rule and practical assistance in preparing a compliance plan, broadcasters should consult The FCC’s Equal Employment Opportunity Rules and Policies – A Guide for Broadcasters published by Pillsbury’s Communications Practice Group.  This publication is available at: http://www.pillsburylaw.com/publications/broadcasters-guide-to-fcc-equal-employment-opportunity-rules-policies.

Deadline for the Annual EEO Public File Report for Nonexempt Radio and Television SEUs

Consistent with the above, December 1, 2018 is the date by which Nonexempt SEUs of radio and television stations licensed to communities in the states identified above, including Class A television stations, must (i) place their Annual EEO Public File Report in the public inspection files of all stations comprising the SEU, and (ii) post the Report on the websites, if any, of those stations.  LPTV stations are also subject to the broadcast EEO Rule, even though LPTV stations are not required to maintain a public inspection file.  Instead, these stations must maintain a “station records” file containing the station’s authorization and other official documents and must make it available to an FCC inspector upon request.  Therefore, if an LPTV station has five or more full-time employees, or is otherwise part of a Nonexempt SEU, it must prepare an Annual EEO Public File Report and place it in the station records file.

These Reports will cover the period from December 1, 2017 through November 30, 2018.  However, Nonexempt SEUs may “cut off” the reporting period up to ten days before November 30, so long as they begin the next annual reporting period on the day after the cut-off day used in the immediately preceding Report.  For example, if the Nonexempt SEU uses the period December 1, 2017 through November 20, 2018 for this year’s report (cutting it off up to ten days prior to November 30, 2018), then next year, the Nonexempt SEU must use a period beginning November 21, 2018 for its report.

Deadline for Performing Menu Option Initiatives

The Annual EEO Public File Report must contain a discussion of the Menu Option initiatives undertaken during the preceding year.  The FCC’s EEO Rule requires each Nonexempt SEU to earn a minimum of two or four Menu Option initiative-related credits during each two-year segment of its eight-year license term, depending on the number of full-time employees and the market size of the Nonexempt SEU. Continue reading →

Published on:

For nearly 80 years, the FCC’s Rules have required broadcasters to file paper copies of various types of documents relating to the control and operation of their stations.  Section 73.3613 of the FCC’s Rules requires broadcasters to file with the FCC certain contracts and instruments relating to network affiliations, present or future ownership or control, and some personnel agreements, as well as local marketing agreements (“LMAs”) and joint sales agreements (“JSAs”).  Today, the FCC voted unanimously to eliminate this requirement.

The rule was originally created in the 1930s to make these documents more accessible to both FCC staff and the public.  However, the advent of the online public inspection file has effectively rendered this octogenarian obligation obsolete.  By March 1, 2018, all full-power TV, Class A TV, AM and FM broadcasters should have transitioned to the online public inspection file (“OPIF”), where they must either (i) upload all Section 73.3613 documents, or (ii) maintain an up-to-date list of those documents and provide a copy of any listed contract requested by a party within seven days of that request.  Similarly, stations are required to list all Section 73.3613 documents in their Ownership Reports, which are then automatically linked by the FCC to station OPIFs.

In eliminating the requirement to file such documents with the Commission, the FCC reasoned that the paper filing rule not only imposed unnecessary burdens on stations, but was redundant with the OPIF and Ownership Report requirements; as a result, the requirement did little to serve the public.  The FCC also observed that very few people actually visited its Reference Information Center, where all of these paper filings are maintained.  Members of the public will continue to be able to obtain copies of Section 73.3613 agreements directly from stations by requesting them.

For their part, stations must remain diligent and update their OPIF contract lists within 30 days of the execution, termination, or amendment of any Section 73.3613 document.  As we have previously discussed, timely filing is now particularly important because all OPIF uploads are timestamped, and late uploads are easy for FCC staff to spot at license renewal time.

Today’s Order also extends the FCC’s permitted redaction rules applicable to JSAs and LMAs to all Section 73.3613 documents.  Section 73.3613 currently only addresses redaction of confidential or proprietary information in the context of JSAs and LMAs.  In the past, stations have filed redacted copies of other contracts, as Section 0.459 of the FCC’s Rules allows certain materials to be withheld from public inspection.  The amended Part 73 redaction rule will explicitly allow limited redaction of all Section 73.3613 documents.

Though these changes will certainly save broadcasters time and resources in the long run, broadcasters should continue filing Section 73.3613 documents with the FCC for the moment.  Before the full rule change can go into effect, it must be approved by the Office of Management and Budget.  In the past, such approvals have typically taken many months, so this rule change may well not go into effect until sometime next year.

Published on:

Each full power and Class A TV station being repacked must file its next Transition Progress Report with the FCC by October 10, 2018. The Report must detail the progress a station has made in constructing facilities on its newly-assigned channel and in terminating operations on its current channel during the months of July, August, and September 2018.

Following the 2017 broadcast television spectrum incentive auction, the FCC imposed a requirement that television stations transitioning to a new channel in the repack file a quarterly Transition Progress Report by the 10th of January, April, July, and October of each year. The first such report was due on October 10, 2017.

The next quarterly Transition Progress Report must be filed with the FCC by October 10, 2018, and must reflect the progress made by the reporting station in constructing facilities on its newly-assigned channel and in terminating operations on its current channel during the period from July 1 through September 30, 2018. The Report must be filed electronically on FCC Form 2100, Schedule 387 via the FCC’s Licensing and Management System (LMS), accessible at https://enterpriseefiling.fcc.gov/dataentry/login.html.

The Transition Progress Report form includes a number of baseline questions, such as whether a station needs to conduct a structural analysis of its tower, obtain any non-FCC permits or FAA Determinations of No Hazard, or order specific types of equipment to complete the transition. Depending on a station’s response to a question, the electronic form then asks for additional information regarding the steps the station has taken towards completing the required item. Ultimately, the form requires each station to indicate whether it anticipates that it will meet the construction deadline for its transition phase.

These quarterly reports will continue for each repacked station until that station has completed construction of its post-repack facilities, has ceased operating on its pre-auction channel, and has reported that information to the FCC. Until then, the Reports must be filed each quarter as well as:

  • Ten weeks before the end of a station’s assigned construction deadline;
  • Ten days after completion of all work related to constructing a station’s post-repack facilities; and
  • Five days after a station ceases operation on its pre-auction channel.

More information about the specific transition phases and related deadlines can be found in this CommLawCenter article on the subject.

A PDF version of this article can be found at 2018 Third Quarter Transition Progress Report.

Published on:

The next Quarterly Issues/Programs List (“Quarterly List”) must be placed in stations’ public inspection files by October 10, 2018, reflecting information for the months of July, August, and September 2018.

Content of the Quarterly List

The FCC requires each broadcast station to air a reasonable amount of programming responsive to significant community needs, issues, and problems as determined by the station. The FCC gives each station the discretion to determine which issues facing the community served by the station are the most significant and how best to respond to them in the station’s overall programming.

To demonstrate a station’s compliance with this public interest obligation, the FCC requires the station to maintain and place in the public inspection file a Quarterly List reflecting the “station’s most significant programming treatment of community issues during the preceding three month period.” By its use of the term “most significant,” the FCC has noted that stations are not required to list all responsive programming, but only that programming which provided the most significant treatment of the issues identified.

Given that program logs are no longer mandated by the FCC, the Quarterly Lists may be the most important evidence of a station’s compliance with its public service obligations. The lists also provide important support for the certification of Class A television station compliance discussed below. We therefore urge stations not to “skimp” on the Quarterly Lists, and to err on the side of over-inclusiveness. Otherwise, stations risk a determination by the FCC that they did not adequately serve the public interest during the license term. Stations should include in the Quarterly Lists as much issue-responsive programming as they feel is necessary to demonstrate fully their responsiveness to community needs. Taking extra time now to provide a thorough Quarterly List will help reduce risk at license renewal time.

It should be noted that the FCC has repeatedly emphasized the importance of the Quarterly Lists and often brings enforcement actions against stations that do not have fully complete Quarterly Lists or that do not timely place such lists in their public inspection file. The FCC’s base fine for missing Quarterly Lists is $10,000.

Preparation of the Quarterly List

The Quarterly Lists are required to be placed in the public inspection file by January 10, April 10, July 10, and October 10 of each year. The next Quarterly List is required to be placed in stations’ public inspection files by October 10, 2018, covering the period from July 1, 2018 through September 30, 2018. Continue reading →

Published on:

Many thought the broadcast incentive auction was the most complex task ever undertaken by the FCC, but the ten-phase spectrum repack following the auction is running a close second.  The TV stations being repacked in Phase 1 are serving as the pioneers of the repack process, and since they must complete the transition to their post-repack channel by November 30, 2018, the applicable deadlines are coming at a fast and furious pace.

The process of repacking these Phase 1 stations has led to lots of questions, and in an effort to answer at least some of them, the FCC released a Public Notice this week discussing a variety of details for stations completing the repack.  Since Phase 1 will be the template for all subsequent phases, all stations being repacked should review the Public Notice with an eye toward discerning their obligations and timely meeting the various milestones.

The Public Notice also reminds transitioning stations that they can, where necessary, seek authority from the FCC to go silent, operate with alternate facilities or reduced power, remain on their pre-transition channels for a period of time, or commence early operations on their post-transition channels.  All of these require filing for Special Temporary Authority and obtaining Commission consent in advance.  While such flexibility will be useful for stations facing unusual repack obstacles, such stations must be sure to schedule adequate time to request and secure Special Temporary Authority from the Commission, lest they find themselves in the uncomfortable position of being forced to violate either the FCC’s repack requirements or the FCC’s operating rules (or being forced off the air entirely).

While the Public Notice provides various ground rules for stations, it also provides a lot of densely packed information on the procedures stations must follow during the repack.  To assist stations, we have consolidated that information below in a concise format that will hopefully make it easier to follow.  While the dates will obviously be different for stations assigned to other phases of the repack, the information below provides a good overview of the path that all repacked stations must navigate during their own repack phase.  Note that the information below assumes that a station will not terminate operations on its pre-transition channel until the last day of the phase (November 30, in the case of Phase 1 stations).  Stations transitioning before that time will need to adjust the other various dates accordingly. 

The Public Notice makes clear that between September 14, 2018 and November 30, 2018, Phase 1 stations may test their equipment/signal and commence operating on their new channel pursuant to program test authority.  The testing phase, however, is strictly for testing, and does not permit stations to simulcast content on both their pre-transition and post-transition channels.  Broadcasters should be aware that some stations’ construction permits do not grant them automatic program test authority (e.g., stations transitioning to Channel 14), so those stations must build extra time into their schedules to request and obtain such authority.

Finally, the Public Notice indicates that linked stations cannot simply test their own equipment and commence operations on their post-transition channel as they choose.  They must coordinate with the other stations in their phase with which they are linked by interference concerns.

The schedule for Phase 1 stations is as follows:

September 1, 2018 Last day to provide notice of channel change to MVPDs.  Any stations granted additional time or flexibility to transition by the FCC must provide MVPDs with this notice 90 days prior to commencing operation on their post-transition channel.  Stations should also review their construction permits for individual notice requirements.  For example, a station must provide notice of its channel change to health care facilities in its service area an “ample time before commencing operation” on its new channel, and some stations may be required to give notice to nearby AM stations, as discussed in more detail in the Public Notice.
September 4, 2018 Last day to request 180-day Construction Permit Extension on Form 2100, Schedule 337.  Stations may request one extension of up to 180 days in which to complete construction of their new facility.  An extension application must include an exhibit demonstrating circumstances that, despite all reasonable efforts by the station, were either unforeseeable or beyond the station’s control.
September 14, 2018 Testing Period begins.
September 21, 2018 File Transition Progress Report on Form 2100, Schedule 387.  Transitioning stations must file a transition progress report ten weeks before the end of their assigned construction deadline.
October 1, 2018 Deadline for channel-sharing repacked stations to file a minor modification application.  Applications must specify the host’s post-auction channel and the parameters of the sharee’s facility.
October 10, 2018 File Quarterly Transition Progress Report on Form 2100, Schedule 387.  Transitioning stations must file a transition progress report on the tenth day following each calendar quarter, providing information regarding the steps taken during the previous quarter to construct facilities for its new channel and end operations on its current channel.  This obligation ceases when a station has completed its transition and has filed a final report with the FCC indicating that fact.
November 1, 2018 Last day to commence consumer notifications of channel change.  Any stations granted additional time or flexibility by the FCC must provide viewers with this notice 30 days prior to commencing operations on their post-transition channel.
November 30, 2018 Last day to operate on pre-auction channel absent FCC consent.
December 5, 2018 Last day to file “Pre-Auction Termination” Transition Progress Report on Form 2100, Schedule 387.  Any stations that terminate operations on their pre-auction channel earlier than November 30 must file this report within 5 days of terminating operations on their pre-auction channel.
December 10, 2018 Last day to file “Construction Completion” Transition Progress Report on Form 2100, Schedule 387.  Any stations that complete construction earlier (including before September 14, 2018) must file this report within 10 days of completion of all construction-related work.
December 10, 2018 Last day to file License to Cover Application on FCC Form 2100, Schedule B (full power) or Schedule F (Class A).  Any stations that commence program test operations earlier than November 30 must file this application within 10 days of commencing program test operations.
December 30, 2018 Last day to file certification of compliance with viewer notification obligations.  Any stations that complete their transitions earlier than November 30 must place these certifications in the public file within 30 days of completing the transition.

Considering the variety of notices, reports, applications, and certifications involved in the repack process, and how tightly interwoven the associated deadlines are, stations should not dally in finalizing their repack plans.  One missed deadline can quickly cascade into multiple missed deadlines, severely undercutting a station’s prospects for achieving a successful repack.

Published on:

The FCC and FEMA have established September 20, 2018 as the date for the next nationwide test of the Emergency Alert System (EAS).  The nationwide test is designed to study the effectiveness of the EAS and to monitor the performance of EAS participants.  The Wireless Emergency Alert (WEA) system will be tested immediately prior to the test of the EAS.  The FCC and FEMA have designated October 3, 2018 as the back-up date should circumstances prevent testing on September 20.

While the test itself is a month away, all EAS participants must file their Form One with the FCC by August 27, 2018 in preparation for the test.  To make this filing, EAS participants must log in to the EAS Test Reporting System using an FCC Username Account.  Those filers who do not already have an account can register for one in the FCC’s updated CORES system.  Once a username account is set up, it will need to be associated with a licensee’s FCC Registration Number (FRN) before the user can draft or file forms for that licensee’s station(s).  Many filers struggled to successfully register in past years, but those who participated in the annual test in 2017 should already be registered.

Form One requests information about a station’s transmitter location, EAS equipment, and the stations it is assigned to monitor.  For most EAS participants, this information will prefill from last year’s Form One (so be particularly careful reviewing it if your monitoring assignments, equipment, or something else has changed since last year).  Stations will also see an instruction to file a separate Form One for each encoder, decoder or combination unit.  Most broadcasters will likely have a combination unit and therefore only need to file a single Form One.  However, there may be situations where multiple filings are needed, for example where a cluster of co-owned radio stations share a studio but have to employ separate encoders and decoders to deal with stations in the group having different monitoring assignments.

As in the past, after the test is completed, participants must report the results of the test by filing Form Two, which requests abbreviated “day of test” data, and then Form Three, which collects more detailed data about the station’s performance.

Filing Deadlines:

  • Form One must be filed on or before August 27, 2018.
  • Form Two (“day of test” data) must be filed by 11:59 PM (EDT) on September 20, 2018.
  • Form Three must be filed on or before November 5, 2018.

Additional Requirements

To prepare for the test, the FCC recommends that EAS participants review the EAS Operating Handbook and be sure that it is available at normal duty positions or EAS equipment locations, and is otherwise readily accessible to employees responsible for managing EAS actions.

Participants should also use this time to ensure their facilities are in a state of “operational readiness.”  Operators should confirm that their EAS equipment has any necessary software and firmware upgrades and that it is capable of receiving the various test codes.  If not automatic, operators must also manually set their EAS equipment to the “official time” as established by the National Institute of Standards and Technology.  Each of these issues has been a significant cause of stations being unable to receive or transmit past tests.

Finally, the person filing for each station should verify that they have the right username, password, and licensee FRN in advance of the filing deadline.  Experience from the the past two national tests revealed that many stations were caught off guard not by the test itself, but by their inability to access the ETRS to make required filings, often because of confusion surrounding how to log in.

Summer break notwithstanding, this is one test that broadcasters should study for ahead of time.

Published on:

In adopting a Notice of Proposed Rule Making late last week, the FCC took the first step in establishing ground rules for reimbursing Low Power Television, TV translator and FM radio stations affected by the TV spectrum repack. Most of the proposed rules track the statutory direction contained in the Reimbursement Expansion Act (REA) adopted in March, but a few potentially controversial proposals were included as well.

The REA limited reimbursement eligibility for LPTV, TV translators and FM radio stations to stations that were licensed and operating on April 13, 2017. In addition, LPTV stations must establish that they were broadcasting for nine of the twelve months prior to April 13, 2017, which was the date the Incentive Auction officially ended. The FCC is seeking comment on what evidence it should request from licensees to substantiate their eligibility, including potentially requiring licensees to provide program guides and/or power bills.

The FCC is also seeking comment on guidelines for reimbursing licensees, focusing on both the types of expenses that should be reimbursed, and the process for licensees seeking reimbursement. For example, the REA limited eligibility to those LPTV and TV translators that filed a Special Displacement application, so the FCC proposed to limit the reimbursable expenses to just those relating to the displacement of such stations.

While it is likely that no FM radio stations will be permanently displaced as a result of the Incentive Auction, the FCC developed a three-tier proposal to reimburse FM stations for expenses to operate auxiliary stations instead of temporarily ceasing operations while tower work is done. The FCC noted that its rules permit stations to either power down or temporarily discontinue operations for less than thirty days without seeking advance authority, so the FCC proposes to limit reimbursement for constructing new or upgraded FM auxiliary facilities to those stations that will be off-air for extended periods of times.

Under the proposal, FM radio stations off-air for more than 30 days would receive reimbursement for 100% of their expenses to construct or modify existing auxiliary facilities, but stations off-air between 11 and 30 days would receive reimbursement for only 75% of their expenses, and stations expected to be off-air for 1-10 days would receive reimbursement for only 50% of their expenses. To be eligible for reimbursement, FM auxiliary facilities will need to cover 80% of the existing station’s geographic or population coverage.

While the FCC obviously intends to borrow heavily from the existing reimbursement process used by Class A and full-power television stations, it is clear that there are unique circumstances surrounding the reimbursement of expenses for LPTV, TV Translator and FM radio stations that will require further examination. Moreover, Commissioner O’Rielly noted in his separate statement that the FCC has proposed to allocate reimbursement funds based on the length of time that FM radio stations will be off air, but urged parties to submit alternative proposals if the FCC’s assumption that “time equals money” is incorrect.