Articles Posted in Low Power & Class A Television

Published on:

The next Quarterly Issues/Programs List (“Quarterly List”) must be placed in stations’ public inspection files by October 10, 2018, reflecting information for the months of July, August, and September 2018.

Content of the Quarterly List

The FCC requires each broadcast station to air a reasonable amount of programming responsive to significant community needs, issues, and problems as determined by the station. The FCC gives each station the discretion to determine which issues facing the community served by the station are the most significant and how best to respond to them in the station’s overall programming.

To demonstrate a station’s compliance with this public interest obligation, the FCC requires the station to maintain and place in the public inspection file a Quarterly List reflecting the “station’s most significant programming treatment of community issues during the preceding three month period.” By its use of the term “most significant,” the FCC has noted that stations are not required to list all responsive programming, but only that programming which provided the most significant treatment of the issues identified.

Given that program logs are no longer mandated by the FCC, the Quarterly Lists may be the most important evidence of a station’s compliance with its public service obligations. The lists also provide important support for the certification of Class A television station compliance discussed below. We therefore urge stations not to “skimp” on the Quarterly Lists, and to err on the side of over-inclusiveness. Otherwise, stations risk a determination by the FCC that they did not adequately serve the public interest during the license term. Stations should include in the Quarterly Lists as much issue-responsive programming as they feel is necessary to demonstrate fully their responsiveness to community needs. Taking extra time now to provide a thorough Quarterly List will help reduce risk at license renewal time.

It should be noted that the FCC has repeatedly emphasized the importance of the Quarterly Lists and often brings enforcement actions against stations that do not have fully complete Quarterly Lists or that do not timely place such lists in their public inspection file. The FCC’s base fine for missing Quarterly Lists is $10,000.

Preparation of the Quarterly List

The Quarterly Lists are required to be placed in the public inspection file by January 10, April 10, July 10, and October 10 of each year. The next Quarterly List is required to be placed in stations’ public inspection files by October 10, 2018, covering the period from July 1, 2018 through September 30, 2018. Continue reading →

Published on:

Many thought the broadcast incentive auction was the most complex task ever undertaken by the FCC, but the ten-phase spectrum repack following the auction is running a close second.  The TV stations being repacked in Phase 1 are serving as the pioneers of the repack process, and since they must complete the transition to their post-repack channel by November 30, 2018, the applicable deadlines are coming at a fast and furious pace.

The process of repacking these Phase 1 stations has led to lots of questions, and in an effort to answer at least some of them, the FCC released a Public Notice this week discussing a variety of details for stations completing the repack.  Since Phase 1 will be the template for all subsequent phases, all stations being repacked should review the Public Notice with an eye toward discerning their obligations and timely meeting the various milestones.

The Public Notice also reminds transitioning stations that they can, where necessary, seek authority from the FCC to go silent, operate with alternate facilities or reduced power, remain on their pre-transition channels for a period of time, or commence early operations on their post-transition channels.  All of these require filing for Special Temporary Authority and obtaining Commission consent in advance.  While such flexibility will be useful for stations facing unusual repack obstacles, such stations must be sure to schedule adequate time to request and secure Special Temporary Authority from the Commission, lest they find themselves in the uncomfortable position of being forced to violate either the FCC’s repack requirements or the FCC’s operating rules (or being forced off the air entirely).

While the Public Notice provides various ground rules for stations, it also provides a lot of densely packed information on the procedures stations must follow during the repack.  To assist stations, we have consolidated that information below in a concise format that will hopefully make it easier to follow.  While the dates will obviously be different for stations assigned to other phases of the repack, the information below provides a good overview of the path that all repacked stations must navigate during their own repack phase.  Note that the information below assumes that a station will not terminate operations on its pre-transition channel until the last day of the phase (November 30, in the case of Phase 1 stations).  Stations transitioning before that time will need to adjust the other various dates accordingly. 

The Public Notice makes clear that between September 14, 2018 and November 30, 2018, Phase 1 stations may test their equipment/signal and commence operating on their new channel pursuant to program test authority.  The testing phase, however, is strictly for testing, and does not permit stations to simulcast content on both their pre-transition and post-transition channels.  Broadcasters should be aware that some stations’ construction permits do not grant them automatic program test authority (e.g., stations transitioning to Channel 14), so those stations must build extra time into their schedules to request and obtain such authority.

Finally, the Public Notice indicates that linked stations cannot simply test their own equipment and commence operations on their post-transition channel as they choose.  They must coordinate with the other stations in their phase with which they are linked by interference concerns.

The schedule for Phase 1 stations is as follows:

September 1, 2018 Last day to provide notice of channel change to MVPDs.  Any stations granted additional time or flexibility to transition by the FCC must provide MVPDs with this notice 90 days prior to commencing operation on their post-transition channel.  Stations should also review their construction permits for individual notice requirements.  For example, a station must provide notice of its channel change to health care facilities in its service area an “ample time before commencing operation” on its new channel, and some stations may be required to give notice to nearby AM stations, as discussed in more detail in the Public Notice.
September 4, 2018 Last day to request 180-day Construction Permit Extension on Form 2100, Schedule 337.  Stations may request one extension of up to 180 days in which to complete construction of their new facility.  An extension application must include an exhibit demonstrating circumstances that, despite all reasonable efforts by the station, were either unforeseeable or beyond the station’s control.
September 14, 2018 Testing Period begins.
September 21, 2018 File Transition Progress Report on Form 2100, Schedule 387.  Transitioning stations must file a transition progress report ten weeks before the end of their assigned construction deadline.
October 1, 2018 Deadline for channel-sharing repacked stations to file a minor modification application.  Applications must specify the host’s post-auction channel and the parameters of the sharee’s facility.
October 10, 2018 File Quarterly Transition Progress Report on Form 2100, Schedule 387.  Transitioning stations must file a transition progress report on the tenth day following each calendar quarter, providing information regarding the steps taken during the previous quarter to construct facilities for its new channel and end operations on its current channel.  This obligation ceases when a station has completed its transition and has filed a final report with the FCC indicating that fact.
November 1, 2018 Last day to commence consumer notifications of channel change.  Any stations granted additional time or flexibility by the FCC must provide viewers with this notice 30 days prior to commencing operations on their post-transition channel.
November 30, 2018 Last day to operate on pre-auction channel absent FCC consent.
December 5, 2018 Last day to file “Pre-Auction Termination” Transition Progress Report on Form 2100, Schedule 387.  Any stations that terminate operations on their pre-auction channel earlier than November 30 must file this report within 5 days of terminating operations on their pre-auction channel.
December 10, 2018 Last day to file “Construction Completion” Transition Progress Report on Form 2100, Schedule 387.  Any stations that complete construction earlier (including before September 14, 2018) must file this report within 10 days of completion of all construction-related work.
December 10, 2018 Last day to file License to Cover Application on FCC Form 2100, Schedule B (full power) or Schedule F (Class A).  Any stations that commence program test operations earlier than November 30 must file this application within 10 days of commencing program test operations.
December 30, 2018 Last day to file certification of compliance with viewer notification obligations.  Any stations that complete their transitions earlier than November 30 must place these certifications in the public file within 30 days of completing the transition.

Considering the variety of notices, reports, applications, and certifications involved in the repack process, and how tightly interwoven the associated deadlines are, stations should not dally in finalizing their repack plans.  One missed deadline can quickly cascade into multiple missed deadlines, severely undercutting a station’s prospects for achieving a successful repack.

Published on:

The FCC and FEMA have established September 20, 2018 as the date for the next nationwide test of the Emergency Alert System (EAS).  The nationwide test is designed to study the effectiveness of the EAS and to monitor the performance of EAS participants.  The Wireless Emergency Alert (WEA) system will be tested immediately prior to the test of the EAS.  The FCC and FEMA have designated October 3, 2018 as the back-up date should circumstances prevent testing on September 20.

While the test itself is a month away, all EAS participants must file their Form One with the FCC by August 27, 2018 in preparation for the test.  To make this filing, EAS participants must log in to the EAS Test Reporting System using an FCC Username Account.  Those filers who do not already have an account can register for one in the FCC’s updated CORES system.  Once a username account is set up, it will need to be associated with a licensee’s FCC Registration Number (FRN) before the user can draft or file forms for that licensee’s station(s).  Many filers struggled to successfully register in past years, but those who participated in the annual test in 2017 should already be registered.

Form One requests information about a station’s transmitter location, EAS equipment, and the stations it is assigned to monitor.  For most EAS participants, this information will prefill from last year’s Form One (so be particularly careful reviewing it if your monitoring assignments, equipment, or something else has changed since last year).  Stations will also see an instruction to file a separate Form One for each encoder, decoder or combination unit.  Most broadcasters will likely have a combination unit and therefore only need to file a single Form One.  However, there may be situations where multiple filings are needed, for example where a cluster of co-owned radio stations share a studio but have to employ separate encoders and decoders to deal with stations in the group having different monitoring assignments.

As in the past, after the test is completed, participants must report the results of the test by filing Form Two, which requests abbreviated “day of test” data, and then Form Three, which collects more detailed data about the station’s performance.

Filing Deadlines:

  • Form One must be filed on or before August 27, 2018.
  • Form Two (“day of test” data) must be filed by 11:59 PM (EDT) on September 20, 2018.
  • Form Three must be filed on or before November 5, 2018.

Additional Requirements

To prepare for the test, the FCC recommends that EAS participants review the EAS Operating Handbook and be sure that it is available at normal duty positions or EAS equipment locations, and is otherwise readily accessible to employees responsible for managing EAS actions.

Participants should also use this time to ensure their facilities are in a state of “operational readiness.”  Operators should confirm that their EAS equipment has any necessary software and firmware upgrades and that it is capable of receiving the various test codes.  If not automatic, operators must also manually set their EAS equipment to the “official time” as established by the National Institute of Standards and Technology.  Each of these issues has been a significant cause of stations being unable to receive or transmit past tests.

Finally, the person filing for each station should verify that they have the right username, password, and licensee FRN in advance of the filing deadline.  Experience from the the past two national tests revealed that many stations were caught off guard not by the test itself, but by their inability to access the ETRS to make required filings, often because of confusion surrounding how to log in.

Summer break notwithstanding, this is one test that broadcasters should study for ahead of time.

Published on:

In adopting a Notice of Proposed Rule Making late last week, the FCC took the first step in establishing ground rules for reimbursing Low Power Television, TV translator and FM radio stations affected by the TV spectrum repack. Most of the proposed rules track the statutory direction contained in the Reimbursement Expansion Act (REA) adopted in March, but a few potentially controversial proposals were included as well.

The REA limited reimbursement eligibility for LPTV, TV translators and FM radio stations to stations that were licensed and operating on April 13, 2017. In addition, LPTV stations must establish that they were broadcasting for nine of the twelve months prior to April 13, 2017, which was the date the Incentive Auction officially ended. The FCC is seeking comment on what evidence it should request from licensees to substantiate their eligibility, including potentially requiring licensees to provide program guides and/or power bills.

The FCC is also seeking comment on guidelines for reimbursing licensees, focusing on both the types of expenses that should be reimbursed, and the process for licensees seeking reimbursement. For example, the REA limited eligibility to those LPTV and TV translators that filed a Special Displacement application, so the FCC proposed to limit the reimbursable expenses to just those relating to the displacement of such stations.

While it is likely that no FM radio stations will be permanently displaced as a result of the Incentive Auction, the FCC developed a three-tier proposal to reimburse FM stations for expenses to operate auxiliary stations instead of temporarily ceasing operations while tower work is done. The FCC noted that its rules permit stations to either power down or temporarily discontinue operations for less than thirty days without seeking advance authority, so the FCC proposes to limit reimbursement for constructing new or upgraded FM auxiliary facilities to those stations that will be off-air for extended periods of times.

Under the proposal, FM radio stations off-air for more than 30 days would receive reimbursement for 100% of their expenses to construct or modify existing auxiliary facilities, but stations off-air between 11 and 30 days would receive reimbursement for only 75% of their expenses, and stations expected to be off-air for 1-10 days would receive reimbursement for only 50% of their expenses. To be eligible for reimbursement, FM auxiliary facilities will need to cover 80% of the existing station’s geographic or population coverage.

While the FCC obviously intends to borrow heavily from the existing reimbursement process used by Class A and full-power television stations, it is clear that there are unique circumstances surrounding the reimbursement of expenses for LPTV, TV Translator and FM radio stations that will require further examination. Moreover, Commissioner O’Rielly noted in his separate statement that the FCC has proposed to allocate reimbursement funds based on the length of time that FM radio stations will be off air, but urged parties to submit alternative proposals if the FCC’s assumption that “time equals money” is incorrect.

Comment deadlines have not yet been established, but comments on the FCC’s proposals will be due 30 days after the NPRM’s publication in the Federal Register, with reply comments due 30 days after that date.

Published on:

Each full power and Class A TV station being repacked must file its next Transition Progress Report with the FCC by July 10, 2018. The Report must detail the progress a station has made in constructing facilities on its newly-assigned channel and in terminating operations on its current channel during the months of April, May, and June 2018. Continue reading →

Published on:

The next Children’s Television Programming Report must be filed with the FCC and placed in stations’ public inspection files by July 10, 2018, reflecting programming aired during the months of April, May, and June 2018.

Statutory and Regulatory Requirements

As a result of the Children’s Television Act of 1990 (“Act”) and the FCC rules adopted under the Act, full power and Class A television stations are required, among other things, to: (1) limit the amount of commercial matter aired during programs originally produced and broadcast for an audience of children 12 years of age and under, and (2) air programming responsive to the educational and informational needs of children 16 years of age and under.

These two obligations, in turn, require broadcasters to comply with two paperwork requirements. Specifically, stations must: (1) place in their online public inspection file one of four prescribed types of documentation demonstrating compliance with the commercial limits in children’s television, and (2) submit FCC Form 398, which requests information regarding the educational and informational programming the station has aired for children 16 years of age and under. Form 398 must be filed electronically with the FCC. The FCC automatically places the electronically filed Form 398 filings into the respective station’s online public inspection file. However, each station should confirm that has occurred to ensure that its online public inspection file is complete. The base fine for noncompliance with the requirements of the FCC’s Children’s Television Programming Rule is $10,000.

Broadcasters must file their reports via the Licensing and Management System (LMS), accessible at https://enterpriseefiling.fcc.gov/dataentry/login.html.

Noncommercial Educational Television Stations

Because noncommercial educational television stations are precluded from airing commercials, the commercial limitation rules do not apply to such stations. Accordingly, noncommercial television stations have no obligation to place commercial limits documentation in their public inspection files. Similarly, though noncommercial stations are required to air programming responsive to the educational and informational needs of children 16 years of age and under, they do not need to complete FCC Form 398. They must, however, maintain records of their own in the event their performance is challenged at license renewal time. In the face of such a challenge, a noncommercial station will be required to have documentation available that demonstrates its efforts to meet the needs of children.

Commercial Television Stations

Commercial Limitations

The FCC’s rules require that stations limit the amount of “commercial matter” appearing in children’s programs to 12 minutes per clock hour on weekdays and 10.5 minutes per clock hour on the weekend. In addition to commercial spots, website addresses displayed during children’s programming and promotional material must comply with a four-part test or they will be considered “commercial matter” and counted against the commercial time limits. In addition, the content of some websites whose addresses are displayed during programming or promotional material are subject to host-selling limitations. Program promos also qualify as “commercial matter” unless they promote (i) children’s educational/informational programming, or (ii) other age-appropriate programming appearing on the same channel. Licensees must prepare supporting documents to demonstrate compliance with these limits on a quarterly basis.

For commercial stations, proof of compliance with these commercial limitations must be placed in the online public inspection file by the tenth day of the calendar quarter following the quarter during which the commercials were aired. Consequently, this proof of compliance should be placed in your online public inspection file by July 10, 2018, covering programming aired during the months of April, May, and June 2018.

Documentation to show that the station has been complying with this requirement can be maintained in several different forms:

  • Stations may, but are not obligated to, keep program logs in order to comply with the commercial limits rules. If the logs are kept to satisfy the documentation requirement, they must be placed in the station’s public inspection file. The logs should be reviewed by responsible station officials to be sure they reflect compliance with both the numerical and content requirements contained in the rules.
  • Tapes of children’s programs will also satisfy the rules, provided they are placed in the station’s public inspection file and are available for viewing by those who visit the station to examine the public inspection file. The FCC has not addressed how this approach can be utilized since the advent of online public inspection files.
  • A station may create lists of the number of commercial minutes per hour aired during identified children’s programs. The lists should be reviewed on a routine basis by responsible station personnel to be sure they reflect compliance with both the numerical and content requirements contained in the rule.
  • The station and its network/syndicators may certify that as a standard practice, they format and air the identified children’s programs so as to comply with the statutory limit on commercial matter, and provide a detailed listing of any instances of noncompliance. Again, the certification should be reviewed on a routine basis by responsible station officials to ensure that it is accurate and that the station did not preempt programming or take other action that might affect the accuracy of the network/syndicator certification.
  • Regardless of the method a station uses to show compliance with the commercial limits, it must identify the specific programs that it believes are subject to the rules, and must list any instances of noncompliance. As noted above, commercial limits apply only to programs originally produced and broadcast primarily for an audience of children ages 12 and under.

Continue reading →

Published on:

The next Quarterly Issues/Programs List (“Quarterly List”) must be placed in stations’ public inspection files by July 10, 2018, reflecting information for the months of April, May, and June 2018.

Content of the Quarterly List

The FCC requires each broadcast station to air a reasonable amount of programming responsive to significant community needs, issues, and problems as determined by the station. The FCC gives each station the discretion to determine which issues facing the community served by the station are the most significant and how best to respond to them in the station’s overall programming.

To demonstrate a station’s compliance with this public interest obligation, the FCC requires the station to maintain and place in the public inspection file a Quarterly List reflecting the “station’s most significant programming treatment of community issues during the preceding three month period.” By its use of the term “most significant,” the FCC has noted that stations are not required to list all responsive programming, but only that programming which provided the most significant treatment of the issues identified.

Given that program logs are no longer mandated by the FCC, the Quarterly Lists may be the most important evidence of a station’s compliance with its public service obligations. The lists also provide important support for the certification of Class A television station compliance discussed below. We therefore urge stations not to “skimp” on the Quarterly Lists, and to err on the side of over-inclusiveness. Otherwise, stations risk a determination by the FCC that they did not adequately serve the public interest during the license term. Stations should include in the Quarterly Lists as much issue-responsive programming as they feel is necessary to demonstrate fully their responsiveness to community needs. Taking extra time now to provide a thorough Quarterly List will help reduce risk at license renewal time.

It should be noted that the FCC has repeatedly emphasized the importance of the Quarterly Lists and often brings enforcement actions against stations that do not have fully complete Quarterly Lists or that do not timely place such lists in their public inspection file. The FCC’s base fine for missing Quarterly Lists is $10,000.

Preparation of the Quarterly List

The Quarterly Lists are required to be placed in the public inspection file by January 10, April 10, July 10, and October 10 of each year. The next Quarterly List is required to be placed in stations’ public inspection files by July 10, 2018, covering the period from April 1, 2018 through June 30, 2018.

  • Stations should maintain routine outreach to the community to learn of various groups’ perceptions of community issues, problems, and needs. Stations should document the contacts they make and the information they learn. Letters to the station regarding community issues should be made a part of the station’s database.
  • There should be procedures in place to organize the information that is gathered and bring it to the attention of programming staff with a view towards producing and airing programming that is responsive to significant community issues. This procedure and its results should be documented.
  • Stations should ensure that there is some correlation between the station’s contacts with the community, including letters received from the public, and the issues they have identified in their Quarterly Lists. A station should not overlook significant issues. In a contested license renewal proceeding, while the station may consider what other stations in the market are doing, each station will have the burden of persuading the FCC that it acted “reasonably” in deciding which issues to address and how.
  • Stations should not specify an issue for which no programming is identified. Conversely, stations should not list programs for which no issue is specified.
  • Under its former rules in this area, the FCC required a station to list five to ten issues per Quarterly List. While that specific rule has been eliminated, the FCC has noted that such an amount will likely demonstrate compliance with the station’s issue-responsive programming obligations. However, the FCC has noted that some licensees may choose to concentrate on fewer than five issues if they cover them in considerable depth. Conversely, the FCC has noted that other broadcasters may address more than ten issues in a given quarter, due perhaps to program length, format, etc.
  • The Quarterly Lists should reflect a wide variety of significant issues. For example, five issues affecting the Washington, DC community might be: (1) the fight over statehood for the District of Columbia; (2) fire code violations in DC school buildings; (3) clean-up of the Anacostia River; (4) reforms in the DC Police Department; and (5) proposals to increase the use of traffic cameras on local streets. The issues should change over time, reflecting the station’s ongoing ascertainment of changing community needs and concerns.
  • Accurate and complete records of which programs were used to discuss or treat which issues should be preserved so that the job of constructing the Quarterly List is made easier. The data retained should help the station identify the programs that represented the “most significant treatment” of issues, e.g., duration, depth of presentation, frequency of broadcast, etc.
  • The listing of “most significant programming treatment” should demonstrate a wide variety in terms of format, duration (long-form and short-form programming), source (locally produced is presumptively the best), time of day (times of day when the programming is likely to be effective), and days of the week. Stations should not overlook syndicated and network programming as ways to address issues.
  • Stations should prepare each Quarterly List in time for it to be placed in their public inspection file on or before the due date. If the deadline is not met, stations should give the true date when the document was placed in the public inspection file and explain its lateness.
  • Stations should show that their programming commitment covers all three months within each quarter.

Continue reading →

Published on:

Pillsbury’s communications lawyers have published FCC Enforcement Monitor monthly since 1999 to inform our clients of notable FCC enforcement actions against FCC license holders and others.  This month’s issue includes:

Headlines:

  • Louisiana Class A TV Station Settles Online Public File Violations for $50,000 Ahead of License Renewal
  • FCC and Michigan Teenager Enter Into Consent Decree After Misuse of Public Safety Communications System
  • Missouri Telco Agrees to $16,000 Settlement Over Unauthorized Transfers

When Violations Accumulate: Online Public File Violations Lead to $50,000 Settlement with the FCC

The FCC recently entered into a Consent Decree with a Louisiana Class A TV station licensee to resolve an investigation into the station’s failure to comply with its online Public Inspection File obligations.

Section 73.3526 of the FCC’s Rules requires licensees to timely place certain items in their online Public Inspection File relating to a station’s programming and operations.  For example, Section 73.3526(e)(11)(i) requires stations to place an issues/programs list in their Public Inspection File each quarter.  That document must list programs aired during the preceding quarter that are responsive to issues identified by the station as important to its community.  Section 73.3526(e)(11)(ii) requires broadcasters to quarterly certify their compliance with the commercial limits on children’s television programming.

Also on a quarterly basis, Section 73.3526(e)(11)(iii) requires stations to file a Children’s Television Programming Report detailing their efforts to air programming serving the educational and informational needs of children.  Section 73.2526(e)(17) similarly requires Class A TV stations to provide documentation demonstrating continued compliance with the FCC’s eligibility and service requirements for maintaining their Class A status.

When the broadcaster filed its license renewal application in February 2013, it disclosed that it had failed to comply with certain Public File requirements during its most recent license term.  Over the next year and a half, the FCC sent letters to the broadcaster requesting that it (1) upload the missing and late-filed documents and (2) provide an explanation for its failure to comply with the Rules.  The FCC did not receive a response until, in 2015, the broadcaster uploaded the required documents to its online Public File.

The broadcaster subsequently admitted that, since 2005, it had not prepared and would be unable to recreate 16 quarters worth of issues/programs lists.  The broadcaster also stated that it had failed to timely file dozens of other issues/programs lists, Class A certifications, Children’s Television Programming Reports, and children’s programming commercial limits certifications.

Under the terms of the Consent Decree, the broadcaster agreed to (1) admit its violations of the Rules; (2) pay a $50,000 civil penalty to the United States Treasury; and (3) implement and maintain a compliance plan to avoid future violations.  The compliance plan must remain in effect until the FCC finalizes its review of the broadcaster’s next license renewal application.  In return for the station’s timely payment, the FCC will end the investigation and grant the station’s pending license renewal application for a term ending in June 2021.

The next application cycle for broadcast license renewals begins in June 2019, and the FCC’s license renewal application form requires stations to certify that their Public Inspection File has been complete at all times during the license term, in compliance with Section 73.3526 (or Section 73.3527 in the case of noncommercial stations).

As the last radio stations moved their Public Files online in March of this year, missing and late-filed documents now can be easily spotted by the FCC, increasing the likelihood of penalties not just for Public File violations, but for falsely certifying Public File compliance in the license renewal application.  With that in mind, the FCC recently encouraged licensees to address Public File compliance issues as soon as possible to reduce the impact on upcoming license renewals.

Sounds Like Teen Spirit: Traffic Stop Results in Michigan Teenager’s Consent Decree for Misuse of a Public Safety Network

The Enforcement Bureau entered into a Consent Decree with a 19-year old amateur radio licensee who made unauthorized radio transmissions on the Michigan Public Safety Communications System (MPSCS).  The agreement concludes an investigation that began when Michigan State Police discovered a cloned radio device during a routine traffic stop.

Section 301 of the Act prohibits the transmission of radio signals without prior FCC authorization, Section 333 of the Act prohibits willful or malicious interference with licensed radio communications, and Section 90.20 of the Rules establishes the requirements to obtain authorization to use frequencies reserved for public safety uses.  In addition, Sections 90.403, 90.405, and 90.425 of the Rules set operating requirements for using these public safety frequencies. Continue reading →

Published on:

Today the FCC publicly released a Report and Order eliminating TV stations’ annual obligation to report whether they have provided feeable ancillary or supplementary services on their spectrum during the past year unless they have actually provided such services.  The order was originally slated for discussion and a vote at next week’s FCC Open Meeting, but the Commission wound up adopting this widely supported change early, unanimously voting for it on circulation.

Previously, all digital television stations had to report by December 1 of each year whether they had provided feeable ancillary or supplementary services in the past year, what those services were, and then submit payment to the government of 5% of the gross revenue derived from such services.  Ancillary and supplementary services are any services provided on a TV station’s digital spectrum that is not needed to provide the single free over-the-air program stream required by the FCC.  The reason the word “feeable” is important is that broadcast video streams (i.e., multicast streams) do not trigger payment of the 5% fee.  Examples previously provided by the FCC of feeable ancillary and supplementary services include computer software distribution and data transmissions.

Observers had expected this rule change for a while.  In the spring of 2017, FCC Chairman Ajit Pai spearheaded the “Modernization of Media Regulation Initiative,” which aimed to institute a massive review of potentially outdated or irrelevant regulations affecting broadcasters, cable system operators, and satellite providers.  At Commissioner Michael O’Rielly’s urging, the Commission originally proposed today’s changes in a Notice of Proposed Rulemaking (NPRM) in October 2017.  The following month, the Media Bureau spontaneously waived the December 1, 2017 filing deadline for TV stations that had not provided feeable services over the prior twelve-month reporting period, signaling that the proposed rule change was likely coming.

Indeed, the FCC received broad support from commenters for the change.  In last year’s NPRM, the FCC noted that of 1,384 full-power commercial TV stations, fewer than 15 reported revenues from ancillary or supplementary services, netting the Commission around $13,000 in fees.

As a result, today’s Order amends Section 73.624(g) of the FCC’s Rules to require that only TV stations actually providing feeable ancillary or supplementary services need file the report in the future.  The FCC could find no justification for the immense expense incurred in having broadcasters submit, and the FCC collect and process, forms merely indicating the station hadn’t provided such services.  It wasn’t so much the FCC concluding that the expense outweighed the public interest benefit; it was the FCC being unable to point to a public interest benefit.

Which just makes you wonder just how this rule stayed in place for nearly 20 years, and no prior FCC bothered to ask that fundamental question.

 

Published on:

Each full power and Class A TV station being repacked must file its next Transition Progress Report with the FCC by April 10, 2018. The Report must detail the progress a station has made in constructing facilities on its newly assigned channel and in terminating operations on its current channel during the months of January, February, and March 2018.

Continue reading →